Engineering metrics programs usually fail for one of ten reasons: they measure output instead of outcomes, turn metrics into targets, compare teams, rank individuals, lean on a single number, run on dirty data, never lead to a decision, ignore how developers experience the work, treat AI usage as productivity, or have no owner. Each failure has an early warning sign and a known fix. Most programs can be rescued in 30 days by cutting the metric list, moving every measure to team level and tying the next review to one decision.
How can you tell a metrics program is failing?
Failure rarely looks like a crash. It looks like a dashboard no one opens, a review that runs out of time before anything is decided, or a metric that keeps improving while delivery doesn't. Engineers stop raising problems in retrospectives. Someone asks whether the tracking can be switched off.
These signs have a common cause. Measurement changes behavior, as Orosz and Beck put it in their 2023 response to a widely debated consulting framework for measuring developer productivity. If the program rewards the wrong behavior, people supply it.
What are the ten failure modes, and how do you fix each one?
Failures in what you measure
1. Measuring output instead of outcomes
Output is easy to count and tells you little. Lines of code and commit counts reward volume, punish refactoring, and are now inflated by AI tools. Orosz and Beck argue that measuring effort and output is not necessarily the answer, and urge leaders to look to outcome and impact measurements to decide what to measure. The fix is to start each program, and each review, from an outcome question such as why releases slip or whether quality is holding. Our guide to building a metrics program from zero shows how to turn those questions into a starter set.
5. Leaning on a single number
A single headline metric invites the wrong argument. The SPACE framework (Forsgren and colleagues, 2021) states that productivity can't be reduced to a single dimension or metric, and recommends capturing several metrics across at least three dimensions. In practice, pair every speed metric with a quality metric: cycle time with rework, deployment frequency with change fail rate.
10. Treating AI usage as productivity
This is the newest failure, and it wasn't on anyone's list two years ago. Atlassian's 2026 developer experience report found 60% of developers say AI usage is treated as a productivity signal, and 41% sometimes use AI more than necessary because they feel expected to. The same report found 65% regularly spend time correcting AI output. A program that counts AI usage rewards the 41% and misses the cost of the 65%. Measure what AI-assisted work produced: pull requests that merged, survived review and didn't come back as rework, set against what the tools cost. We built our SURGE framework for exactly that question.
Failures in how you use the metrics
2. Turning metrics into targets
When a measure becomes a target, it stops being a good measure, which is the idea usually called Goodhart's Law. DORA's own guidance applies it directly: setting its metrics as broad goals increases the likelihood that teams will try to game them. A team told to deploy more often can split changes into tiny deployments. The fix is to set goals on changes, such as adding a review rotation, and watch the metric and a guardrail to see whether the change worked. Our guide to engineering effectiveness OKRs shows how to write these without backfiring.
3. Comparing teams with each other
DORA's guidance says comparing teams can be problematic because their contexts differ, and that the goal is to improve a team's own performance over time, not to compete with other teams. A platform team and a product team have different healthy ranges. League tables push teams to hide incidents and avoid risky but valuable work. Compare each team with its own history instead.
4. Ranking individuals
This is the fastest way to lose a program. The SPACE authors write that activity metrics should never be used in isolation either to reward or to penalize developers. Google's guidance on OKRs makes a parallel point: OKRs are not synonymous with performance evaluation. The fix is a written rule that metrics stay at team level, with individual data used only in one-to-ones for coaching. Our article on measuring engineering work without developer backlash includes a data-use charter you can adapt.
7. Never reaching a decision
A program that informs no decision becomes a reporting cost. The warning sign is a review that ends with everyone agreeing the charts are interesting. The fix is structural: end every review with no more than three changes, each with an owner, a metric and a date, and open the next review by checking them. Our guide to running a quarterly engineering health review gives the agenda.
Failures in what holds the program up
6. Running on dirty data
If tickets lack parents, statuses lag reality and teams count deployments differently, every number is contested. Reviews turn into debates about definitions. The fix is unglamorous: write each definition on one page, get team leads to sign it, and clean the data behind your two most important metrics first. Our guide to Jira hygiene with Claude covers the ticket side. This is also where we spend real effort with customers: our engineers clean up inconsistent Jira, Git and CI/CD data with you during onboarding, because a program built on contested data rarely survives its second review.
8. Ignoring how developers experience the work
System data shows where work waits. It doesn't show frustration. Atlassian's 2025 survey of 3,500 developers and managers found 63% of developers say leaders don't understand their pain points, up from 44% the year before, and 50% lose 10 or more hours a week to non-coding work. A program that never asks developers will miss the problems they would have named. Add a short quarterly survey and put the friction score on the scorecard. Our SPACE metrics view maps satisfaction and collaboration alongside activity for this reason.
9. Having no owner
Programs without an owner decay quietly. Definitions drift, new teams aren't mapped, and the scorecard stops updating. Name a program owner who maintains definitions and the review pre-read, and an executive sponsor who protects the program from misuse, including from leaders who want a leaderboard.
How do you rescue a failing program in 30 days?
The first week matters most. Removing rankings publicly is the clearest signal that the program has changed. Without it, the other three weeks won't be believed.
How do you stop a new program from failing?
Run a pre-mortem before launch. Imagine it is a year from now and the program has been quietly dropped, then ask the questions below. Any "no" points to the failure most likely to hit you.
- Is the first question an outcome a senior leader cares about? If not, expect failure 1.
- Are all metrics at team level, in writing? If not, expect failure 4.
- Does every speed metric have a quality partner? If not, expect failures 2 and 5.
- Are definitions written and signed off? If not, expect failure 6.
- Is there a review that ends in decisions? If not, expect failure 7.
- Is a developer survey on the scorecard? If not, expect failure 8.
- Is there a named owner? If not, expect failure 9.
Want to restart your program from a clean baseline? We run a free, read-only AI ROI report on your team data and benchmark it against 1,000+ engineering teams already on the platform, at team level and with AI usage tied to merged work. Book a demo or talk to an expert about what went wrong last time.




