To build an engineering metrics program from zero, start with one question leadership needs answered, pick three to five metrics that answer it, agree on how each is defined, take a baseline for four to six weeks, and use it to make one visible improvement before you add anything else. Share the data with teams before leaders see it, and keep every metric at team level. Most programs that last grow this way, from one useful answer to a regular review. This guide gives the five phases, a starter metric set, the roles you need and a 12-month plan.
Why start a metrics program at all?
Most engineering organizations already have data. What they lack is a shared answer to simple questions: are we getting faster, is quality holding, and where is time going? Without a program, those answers come from whoever spoke last in the meeting. Our post on why engineering leaders need metrics makes the longer case.
Perception is not a reliable substitute. In METR's 2025 randomized trial, experienced open-source developers took 19% longer on tasks when using AI tools, yet afterwards believed AI had made them 20% faster. METR has since said its follow-up data is an unreliable signal, so treat the number as a caution about self-report rather than a verdict on AI. The point stands: what people feel and what the system shows can diverge, and a program needs both.
Phase 1: What question should the program answer first?
Pick one question that a senior leader is asking now. The question decides the metrics. Here are common starting points and where they lead.
Orosz and Beck's 2023 response to a widely debated consulting framework puts the principle well: they urged engineering leaders to look to outcome and impact measurements to decide what to measure, rather than effort and output. A first question tied to an outcome, such as releases slipping, keeps the program honest from day one.
Phase 2: How do you choose and define the first metrics?
Keep the first set to three to five metrics. The SPACE framework recommends capturing several metrics across at least three of its dimensions, and warns that productivity can't be reduced to a single metric. A starter set that works for most teams looks like this.
Write each definition on one page and get team leads to sign off. This is the slowest part of the program and the part most teams skip. If two teams count a deployment differently, every later comparison is wrong. Read cycle time versus lead time before you settle the flow definitions, and our guide to Jira hygiene before you trust the capacity split.
Phase 3: How do you take a baseline?
Connect your sources, then collect four to six weeks of data before showing anyone a target. A baseline tells you where each team stands today, and it is what every later number is compared with. DORA's guidance says its metrics are meant to be applied at the application or service level and that measuring over time is what shows whether performance is changing. Comparing teams with each other, it warns, can be problematic because their contexts differ.
- Connect Git, Jira and CI/CD first. Add surveys and AI tool data once those three are clean.
- Fix data problems you find. Missing parents, inconsistent statuses and unmapped repositories show up in the first week.
- Show each team its own baseline first. Engineers should see their data before leaders do, and correct anything that looks wrong.
- Write down what surprised people. Those surprises are usually where the first improvement lies.
Our guide to measuring engineering work without developer backlash covers how to introduce the baseline so it builds trust instead of fear.
Phase 4: How do you prove the program with one improvement?
In the first quarter, pick one problem the baseline confirms and fix it. A review queue that two teams complain about is a good candidate. Make one change, such as a review rotation, measure the effect for four to six weeks with a quality guardrail, and tell everyone what changed.
This step matters more than the tooling. A program that produces a visible fix in its first quarter gets support for its second. A program that produces only dashboards gets quietly ignored. Atlassian's 2026 report gives the principle in one line: leaders should be deliberate about the problems they want to solve and measure the resulting outcomes, not activity.
Who owns an engineering metrics program?
Should you build the program on in-house tooling or buy a platform?
Many teams start with scripts and a spreadsheet, and that is fine for the first question. The cost appears later: keeping definitions consistent across tools, maintaining integrations as APIs change, and joining Jira to Git so a work item links to its pull requests. Our analysis of the real cost of building an engineering intelligence platform in-house sets out where that line usually falls.
If you buy, choose for definitions and data cleanup, not chart count. We built Hivel around that: our engineers clean up inconsistent Jira, Git and CI/CD data with you during onboarding, our process flow view gives the cycle time split in Table 2 without custom work, and our engineering goals feature lets teams set monthly or quarterly targets on cycle time, review coverage, rework and deployment frequency and see whether they are on track. When AI tools are part of the question, our SURGE framework adds spend, usage and AI-assisted output to the same data.
What does the first 12 months look like?
The fourth-quarter step is easy to skip. Every program accumulates metrics. Removing the ones that no decision used keeps the scorecard readable. Our guide to running a quarterly engineering health review covers the Q2 meeting, and why engineering metrics programs fail covers what to avoid.
Want a baseline before you write a single definition? We run a free, read-only AI ROI report on your team data and benchmark it against 1,000+ engineering teams already on the platform, so your first question starts with real numbers. Book a demo or talk to an expert about your first quarter.




